From your brief to the container.
Tooling, sampling, molding, decoration, QC and export packing are handled in our own 8,500 m² factory in Dongguan.
Our process
01
Share your brief
Send a product list, reference image or drawing, target quantity and market.
02
Tooling & sampling
We confirm the mold, material and decoration route, then produce samples in 7–10 days with an existing mold.
03
Sample approval
You review the sample, artwork and packaging. We adjust until it matches the approved standard.
04
Mass production
Production runs on 40 compression machines with a normal lead time of 15–20 days after confirmation.
05
Quality control
IQC, first-article approval, in-line inspection and FQC before packing.
06
Export packing
Packed to your carton specification and prepared for FOB shipment.

Material and decoration, controlled in-house.
We work with 100% melamine A5 and A8, food-grade inks and heat-transfer decals. Standard tolerance is ±0.5 mm on dimensions and ±5% on weight; the service temperature range is -20°C to 100°C.
Tooling and sampling.
Our mold library holds 8,000–10,000 molds. Sampling takes 7–10 days with an existing mold and 15–20 days when a new mold is required. Tooling cost depends on the shape and is quoted per project.

Production scale.
8,500 m² of manufacturing space, 40 compression machines and a team of 200 people support an annual capacity of 50 million sets.
8,500 m²Factory area
40Compression machines
50MSets per year
8,000+Molds on site
Packaging and export.
Packaging is built to your specification, with export-standard cartons of 15–18 kg. Terms are FOB, with 30% deposit and 70% before shipment.